6.9.1. PIPING PREFABRICATION - Estimating/monitoring/planning the pre-fabrication of steel (cs, ss, - 5% chr/moly, + 5% chr/moly) pipe spools. All operations including welding.



FAST TRACK TO EMMAS/CALCULATORS ON THIS PAGE

1.1. Click to create an EMMA for planning and monitoring the pre-fabrication of carbon steel pipe spools
1.2. Click to create an EMMA for planning and monitoring the pre-fabrication of stainless steel pipe spools
1.3. Click to create an EMMA for planning and monitoring the pre-fabrication of -5% chr moly steel pipe spools
1.4. Click to create an EMMA for planning and monitoring the pre-fabrication of +5% chr moly steel pipe spools


6.9.1.1. CARBON STEEL PIPING (c.s.) IN FABRICATION SHOP

Sheet 1 can be used for 1 nozzle, or 1 weld, or multiples of all operations in all sizes of pipe, depending on requirements and availability of info. Charts (Sheet 2) can be developed if appropriate. Note: Parts A & B of the estimate (ie Items 1 - 6) comprise input cells.

Also see slide show.


To see an example, click Real-time Sync at the bottom of the following tabulation, enter the secret key 'fabricate' and click connect.


Click FOR TOP OF PAGE

6.9.1.2. STAINLESS STEEL PIPING (s.s.) IN FABRICATION SHOP


Click FOR TOP OF PAGE

6.9.1.3. LOW CHROME STEEL PIPING (-5%) IN FABRICATION SHOP


Click FOR TOP OF PAGE

6.9.1.4. HIGH CHROME STEEL PIPING (+5%) IN FABRICATION SHOP

Click FOR TOP OF PAGE