6.9.3. ERECTION ON PIPE BRIDGES/RACKS - Estimating & monitoring the manhours, manpower, & cost of erecting steel (cs, ss, - 5% chr/moly, + 5% chr/moly)  piping.

FAST TRACK TO EMMAS/CALCULATORS ON THIS PAGE


3.1. Click for carbon steel piping on pipebridges/racks
3.2. Click for stainless steel piping on pipebridges/racks
3.3. Click for -5% chr moly steel piping on pipebridges/racks
3.4. Click for +5% chr moly steel piping on pipebridges/racks


3.1.  CARBON STEEL (cs) PIPING ON PIPE BRIDGES/PIPE RACKS

Click FOR TOP OF PAGE

6.9.3.2.  STAINLESS STEEL (ss) PIPING ON PIPE BRIDGES/PIPE RACKS 

Click FOR TOP OF PAGE

6.9.3.3.  LOW CHROME(-5%) MOLY PIPING ON PIPE BRIDGES/PIPE RACKS 

Click FOR TOP OF PAGE

6.9.3.4.  HIGH CHROME(+5%) MOLY PIPING ON PIPE BRIDGES/PIPE RACKS

Click FOR TOP OF PAGE

CONTINUE TO PIPING ON PIPE TRACKS

CONTINUE TO PIPING IN MAIN PLANT AREAS